Infrastructure

This page has links to the Surrey infrastructure study, the Runnymede infrastructure delivery plan and the Longcross Garden Village infrastructure and viability assessment.

Outline Water Cycle Study 2018

The study provides information to demonstrate workable solutions to issues identified in the preceding phase one scoping report (completed in January 2018) to deliver future development for all development sites (committed and allocations) including recommendations on the policy to deliver it.

Icon for pdf Outline Water Cycle Study (March 2018) [4.31MB]

Scoping Water Cycle Study 2018

The council is required to produce a Water Cycle Study (WCS) as part of its evidence base, which investigates the existing foul water treatment capacity to ensure growth in the district does not impact on water quality.

In addition, the borough falls within an area of demonstrable 'water stress' as defined by the Environment Agency and planned growth (in addition to other pressures) is forecast to lead to a supply demand deficit within the next 10 years.

The scoping WCS therefore also makes recommendations as to what water efficiency standards should be adopted.

The scoping WCS considered the potential impact on water resources and water supply infrastructure as a result of the planned growth across the borough. This document is available to view below:

Icon for pdf Water Cycle Study Phase 1 Scoping (January 2018) [1.28MB]

 

Longcross Garden Village - Infrastructure and Viability Assessment 2017

Engineering firm AECOM has been commissioned by the council to undertake a high level assessment of the viability of bringing forward infrastructure at Longcross in line with garden village principles. The council asked AECOM to focus its analysis on the key garden city principles, with some modifications to tailor them to Longcross and take into account the goals and aspirations of the council as well as the local context. The final report can be viewed below:

Icon for pdf Longcross Garden Village Infrastructure and Viability Assessment (December 2017) [2.34MB]

Runnymede Infrastructure Delivery Plan 2017

Building on the work undertaken for the Infrastructure Needs Assessment (INA) 2017, consultants AECOM were commissioned by the Council to undertake an Infrastructure Delivery Plan (IDP). The IDP and its Addendum contains information on a number of infrastructure projects that will support delivery of the Local Plan and sets out project timing, costs and funding secured to date. The IDP and Addendum is a 'living' document and will be subject to updates over the lifetime of the Local Plan as infrastructure projects evolve over time, especially projects identified in the longer term. In this respect the Council has set out the infrastructure projects identified in the IDP and Addendum in a series of Infrastructure Schedules which align to 5 year phases of the Local Plan and its housing trajectory. The Schedules are based on the timing and costs of the projects identified in the IDP and Addendum but do not include any additional projects, although some may have been renamed since the publication of the IDP and Addendum. The IDP, Addendum and Infrastructure Schedules can be viewed below:

Icon for pdf Infrastructure Delivery Plan Schedules (May 2018) [459.75KB]

Icon for pdf Infrastructure Delivery Plan Addendum (January 2018) [133.35KB]

Icon for pdf Infrastructure Delivery Plan (December 2017) [10.38MB]

Runnymede Infrastructure Needs Assessment 2017

The Infrastructure Needs Assessment (INA) sets out the current baseline infrastructure capacity in Runnymede for a number of different infrastructure types. The INA also considers future infrastructure requirements which will be needed to support the level of growth in the Runnymede Local Plan 2030. A copy of the INA is available to view below along with an addendum report for the additional sites set out in the Local Plan additional sites and options consultation.

Icon for pdf Infrastructure Needs Assessment (May 2017) [8.89MB]

Icon for pdf Infrastructure Needs Assessment Addendum (May 2017) [232.41KB]

Surrey Infrastructure Study  2016

The Surrey infrastructure study was prepared on behalf of the county council and the eleven borough and district councils in Surrey. Each of the boroughs and districts has an existing or emerging local plan that sets out the planned development across its area and the infrastructure needed to support it in the short to medium term. The study brings these plans together to provide an overview of growth and infrastructure at the strategic level across Surrey and to highlight to government, infrastructure providers, developers, local communities and businesses the scale of investment required. The Surrey infrastructure study has been split into different sections and can be found below:

Icon for pdf Surrey Infrastructure Study Executive Summary (January 2016) [503.29KB]

Icon for pdf Surrey Infrastructure Study Introduction (January 2016) [311.47KB]

Icon for pdf Surrey Infrastructure Study Understanding Surrey's growth requirements (January 2016) [2.54MB]

Icon for pdf Surrey Infrastructure Study Infrastructure needs and requirements (January 2016) [2.29MB]

Icon for pdf Surrey Infrastructure Study Development suitability analysis (January 2016) [1.91MB]

Icon for pdf Surrey Infrastructure Study Planning for infrastructure in Surrey (January 2016) [307.37KB]

Icon for pdf Surrey Infrastructure Study Delivery and funding (January 2016) [606.47KB]

Icon for pdf Surrey Infrastructure Study Conclusions (January 2016) [122.46KB]

Icon for pdf Surrey Infrastructure Study Information Caveats (January 2016) [164.91KB]