Site capacity

Site capacity analysis (December 2017)

Alongside the Site Selection Methodology and Assessment (SSMA), Runnymede has also undertaken a capacity analysis of the sites recommended for development. The capacity analysis considers how much development could be delivered on a site while taking account of issues such as type of development, density, and the need to provide green infrastructure.

 

A draft site capacity analysis informed the preparation of the additional sites and options consultation which has been refined into a final version to support the draft Local Plan.

The final site capacity analysis and previous draft are available to view below:

Icon for pdf Final Site Capacity Analysis (December 2017) [4.42MB]

Icon for pdf Draft Site Capacity Analysis (May 2017) [4.62MB]

 

Site capacity analysis addendum (April 2018)

A final site capacity analysis addendum report has been produced to reconsider the capacity for a number of the proposed sites for allocation in the Local Plan.

 

It follows updates to constraints, responses to the draft Local Plan consultation (where considered appropriate), and further site visits and discussions with site promoters and land owners. The site capacity analysis addendum is available to view below:

Icon for pdf Site Capacity Analysis Addendum (April 2018) [2.38MB]

Share this page

Facebook icon Twitter icon email icon

Print

print icon